
By k2_scs at 2012-01-30
1 - 1800 H ¼ Pipe Extension
2 – 20 degree 750 H bank to platform
3 - 300 H Split level and adjoining 3 stair with low flat rail
4 - Entry and turning area for change of direction with 450 H taco
5 - 300 H Ledge
6 - 450 H Flat Ledge with seat pocket
7 – 450 H Ledges
8 – Flat Rail
9 - Increased area for turning between acute corner
10 - 250 H Manual Pad blended to 600 H taco corner
11 - Entry
12 - 450H Split level with 500H Hubba and fly out ledge
13 - 1200 H Mini Ramp with one Enclosed Bowl End, with steep bank extensions (1800 H)
14 - Low ¼ pipe section to maintain flow but to allow views into mini ramp from road
15 - Mini can be used separately as a 6000mm back and forth section, as a return or as a flow section from side to side and around enclosed section.
16 – More skateable ledges, blocks and drop offs are incorporated into the design of the hard and soft court areas. Protective angle coping will be used on designated areas

By k2_scs at 2012-01-30
It is under construction right now and apparently should be completed by end of Feb if the weather doesnt interfere too much

By k2_scs at 2012-01-30

By k2_scs at 2012-01-30

By k2_scs at 2012-01-30

By k2_scs at 2012-01-30

By k2_scs at 2012-01-30

By k2_scs at 2012-01-30

By k2_scs at 2012-01-30

By k2_scs at 2012-01-30

By k2_scs at 2012-01-30



